Site Name

  • siteinfo-WTP 301

Technician

  • ChaiMahabal
Inspection Date
RTU/Housing Type
Scada
Module Type
Input output
Check the battery condition
Physical good
Check power supply voltage, record voltage
13.9 in series = 27.9
Load test system with electronic load for 5 secs, record voltable (limit 11.5V)
Na
Test Charger and record result
Na
Load test battery with electronic load for 1 min, record voltage (limit 11.5V)
Na
Reconnect battery and monitor battery voltage rise
Na
Battery installation date
Check aerial, pole and coax cable for damage
Good
Enclosure free of rust/corrosion
Y
Equipment not damaged
Y
Free from any insect or vermin infestation
Y
Check the radio operation
Na
Measure power output
Na
Check the Standing Wave Ratio (SWR)
Na
Attach laptop and check unit communicates with I/O
Na
Test each input to the telemetry system by starting and stopping equipment
Na
Activate accessible inputs and test instruments or relay inputs at telemetry terminals
N
All site outputs are transmitted to the laptop computer
Na
Test site alarm output is transmitted
Na
Monitor multiplexer operation and interface with the computer systems
Na
Upgrade Abbey systems, DATRAN and Intouch software
Na
Carry out other tasks as directed by engineer
Na
Check base computers, printers, modems and wiring for damage and wear
Na
Test appropriate applications for correct functionality
Na
Check hard disk
Na
Check landline communications
Na
Check aerial, pole and coax cable
Na
Radio free from infestation
Na
Check radio operation
Na
Measure power output
Na
Check the Standing Wave Ratio
Na
Check power supply when transmitting
Na
Recommendations
  1. Replace batteries ASAP 2x RM12 120 - 12, 128.4ah/20hr
  2. Test and tag all equipment
  3. Replace all outside lights with small flood lights( no sensor needed). X3 will need a mounting bracket to adjust direction.
Overall Checked
No