Technician

  • Brian.Firth
Inspection Date
Location
Poroti WTP
Phone
027 355 2248
CompanyDivision
Northland Maintenance
The installation has an earthing system that is correctly rated (where applicable)
Yes
Relies on manufacturers instructions
Yes
Specify type of supply system
MEN system - 230v
Part 2 AS/NZS 3000
Yes
Contact Name
James Kennedy
Contact Address
WDC Water
Email
Brian.firth@mckay.co.nz
Polarity
Correct
Insulation resistance
N/A
Earth Continuity
0.4
Bonding
N/A
Fault Loop impedance
0.82
PSCC
0.28
Connection Date
Certificate Issue Date
Addition
No
Low Risk
Yes
Contains fittings that are safe to connect to a power supply
Yes
General
No
New Work
No
High Risk
No

Replaced burnt out 56 series socket-outlet on RCD at B5.

Also repair broken PEC termination.

RCBO is 30mA C20 and cable is 2.5mm TPS. 

 

RCD test results: 23mA and 102mSec.

Alteration
Off
Part 1 of AS/NZS 3000
Off
Parts of the installation to which this certificate relates that are safe to connect to a power supply
All
Specify Parts
Socket-outlet in caustic bund
Manufacturers Instructions
https://www.jarussell.co.nz/Compliance
The work has been done in accordance with a certified design
No
The work relies on a Supplier Declaration of Conformity (SDoC)
Yes
Supplier Declaration of Conformitytxt
https://www.jarussell.co.nz/Compliance
The installation has been satisfactorily tested in accordance with the Electricity (Safety) Regulations 2010
Yes
Repair
On