Technician
- Brian.Firth
Inspection Date
Location
Seascape PS, Waipu
Phone
027 355 2248
CompanyDivision
Northland Maintenance
The installation has an earthing system that is correctly rated (where applicable)
Yes
Relies on manufacturers instructions
Yes
Specify type of supply system
MEN system - 230v
Part 2 AS/NZS 3000
Yes
Contact Name
James Kennedy
Contact Address
WDC Water
Email
Brian.firth@mckay.co.nz
Polarity
Correct
Insulation resistance
> 999
Earth Continuity
0.2
Bonding
N/A
Fault Loop impedance
0.34
PSCC
0.68
Connection Date
Certificate Issue Date
Addition
Yes
Low Risk
No
Contains fittings that are safe to connect to a power supply
Yes
General
Yes
New Work
No
High Risk
No
3x new 3-pole C20 MCBs, 2.5mm 2c+E circ TPS, 7m.
To supply isolators then VSDs.
Alteration
Off
Part 1 of AS/NZS 3000
Off
Parts of the installation to which this certificate relates that are safe to connect to a power supply
All
Specify Parts
New circuits to new VSDs
Manufacturers Instructions
https://www.jarussell.co.nz/Compliance
The work has been done in accordance with a certified design
No
The work relies on a Supplier Declaration of Conformity (SDoC)
Yes
Supplier Declaration of Conformitytxt
https://www.jarussell.co.nz/Compliance
The installation has been satisfactorily tested in accordance with the Electricity (Safety) Regulations 2010
Yes
Repair
Off